Come back for more.  Will be adding a 2nd 10' section, a 3E 6M yagi and 27' 6M vertical (I hope).  

Base section painted and am finishing first 10' section (between showers).

The winch is in place need to add control box below it and make a cable to get power to it (using power pole).  

Selection Menu