Base section painted and am finishing first 10' section (between showers).

Selection Menu

The winch is in place need to add control box below it and make a cable to get power to it (using power pole).  

Come back for more.  Will be adding a 2nd 10' section, a 3E 6M yagi and 27' 6M vertical (I hope).